Housed in architecturally attractive buildings and with a total refrigerating capacity of 44,000 tons, these two fast-track projects were designed and built to serve chilled water to a range of residential, commercial and government buildings in Abu Dhabi.
Challenge in focus: Our first two district cooling projects were awarded under one contract and required simultaneous construction. Despite the challenges faced when doing something for the first time, the successful completion of these complex plants gave us the opportunity to put our mark in the industrial construction market.